Be a better neighbor. Sign up for EveryBlock to follow and discuss neighborhood news.

Sign up for free →

Added Oct 21 2017

Work continues at the 811 Uptown site at Clarendon and Montrose. According to the September newsletter from the construction company, the concrete structure is expected to be topped off by January 2018, with interior work continuing throughout 2018.

Original article
http://www.uptownupdate.com/2017/10/maryville-progress-by-day-and-by-night.html
Date published
October 21, 2017
    Maryville Progress By Day and By Night
    Work continues at the 811 Uptown site at Clarendon and Montrose. According to the September newsletter from the construction company, the concrete structure is expected to be topped off by January 2018, with interior work continuing throughout 2018.
    http://www.uptownupdate.com
  • Nice to see this moving along!

  • If someone told you 5 years ago that Uptown would be getting a Treasure Island, would you have ever believed it?

  • Has anyone heard when Treasure Island will open?

  • I can't wait for this Treasure Island to open. It will be a nice addition to Mariano's & Jewel. It supposed to open next year some time.

  • Treasure Island is cool. But no setbacks at all. It's like a wall towering over Clarendon. Bad design that could have been avoided. It's like the building going up at the south end of Broadway by Sheridan. Goes right up to a narrow sidewalk. Everywhere you look it is concrete and signs down there.

4 neighbors are subscribed to this conversation.

Posted to Uptown

This was posted to Uptown

What's the news in your neighborhood? Search for your ZIP code:

e.g. 60615